top of page
IMG_6090 4.jpg

SOLID EPOXY

Solid Epoxy System: Image

INSTALL

After Surface Preparation

  • 8-16 hours of cure time 

  • Urethane top-coat must be applied within 24 hour of the last coat for proper adhesion.

  • Urethane top-coat will take 12-24 hours to cure for walking traffic 

  • 48-72 hours for machinery traffic 

Solid Epoxy System: Text

BEST USE

  • Industrial facilities 

  • Warehouse

  • Health Care 

  • Auto Dealerships 

  • Aerospace 

  • Military 

Solid Epoxy System: Text

YOUR EPOXY NEEDS

Every work environment has specific needs when it comes to floor coatings. Below are some of the important factors to consider. Consult with our team to determine the best coating combination for you.

IMG_6438_edited.jpg

ANTI-SLIP

IMG_6439_edited.jpg

HEAT RESISTANT

IMG_6440 2_edited.jpg

CHEMICAL RESISTANT

IMG_6441_edited.jpg

UV RESISTANT

Safety

Having anti-slip grip in your floor is essential when working around moist areas that involve cleaning or have a tendency to have spills. We can add sand to your epoxy to give your employees the grip you need for safety purposes.

Durability

When dealing with hot equipment it is important to have a coating and sealer that is meant for high heat environments. A Hermetic 4.8s slurry may be best for you.

Easy Clean Up

Chemicals can take their toll on a floor. Our epoxy solutions will leave you with a puddle easy to clean up for your team. Depending on the chemicals you are handling, a Novalec epoxy may be the best coating and topcoat for you.

Sun-Proof

There are two ways that your coating can be sun-proofed. 1. Flake system or 2. Pigmented topcoat.

Get a Quote
Solid Epoxy System: Inventory
bottom of page